How to make a Gantt chart (and the other charts)
This Gantt chart maker builds the diagram from text, so you spend your time on the plan instead of on lining up shapes. The same tool handles five chart types.
- Choose a chart type: Gantt chart, timeline, org chart, mind map (concept map) or flowchart.
- Type your outline. Each chart type shows a short sample so you can see the format. For a Gantt chart that is one task per line with a start date and an end date.
- Check the preview. It redraws as you type, so you can fix a date or a label and see the result straight away.
- Download. PNG drops straight into Google Slides, PowerPoint, Word or Google Docs. SVG stays sharp at any size.
Which chart do you need?
| Chart | Use it for | Outline format |
|---|---|---|
| Gantt chart | Project schedules where tasks overlap and depend on each other | Task, start date, end date |
| Timeline | History, roadmaps, a sequence of milestones | Date, event |
| Org chart | Who reports to whom | Indented names and roles |
| Mind map / concept map | Brainstorming, study notes, how ideas connect | Indented topics |
| Flowchart | A process with steps and yes/no decisions | Steps, with arrows written as -> |
If you are unsure, ask what the reader needs to answer. "When?" points to a timeline or Gantt chart. "Who?" points to an org chart. "What happens next?" points to a flowchart.
Worked example: a small website project
Paste this into Gantt mode:
Write copy, 2027-01-04, 2027-01-15
Design pages, 2027-01-11, 2027-01-29
Build site, 2027-01-25, 2027-02-19
Test and fix, 2027-02-15, 2027-02-26
Launch, 2027-03-01, 2027-03-01
You get five bars on a calendar grid, with the overlaps visible at a glance. That overlap is the whole point of a Gantt chart: you can see that design starts before the copy is finished, and decide if that's a risk.
The same project as a timeline would be five dots on a line. Simpler, and better for a slide aimed at people who only care about the launch date.
Org chart and concept map examples
For an organizational chart, indent each person under their manager:
Dana Lee, Owner
Sam Ortiz, Operations
Priya Shah, Warehouse
Alex Kim, Sales
For a concept map template, indent ideas under a central topic. Students use this for revision notes, and teams use it to sort brainstorm output before turning it into a plan.
What makes a good flowchart or Gantt chart
Most charts fail because they try to show everything. A few rules keep them readable:
Flowcharts
Start with one clear trigger, like "Customer requests a refund", and end with a clear outcome. Use the classic shapes the way people expect: rounded boxes for start and end, rectangles for steps, diamonds for yes or no questions. If a flowchart needs more than about 15 boxes, split it into two charts and link them with a note.
Gantt charts
Name tasks with verbs ("Design pages", not "Design"), so each bar reads as work someone does. Add milestones as zero-length tasks, like the launch line in the example above. Add a buffer near the end of the project, because the last tasks are the ones that slip.
Timelines
Pick a consistent date format and stick to it. Mixing "March 2026" with "3/14/26" on the same line looks sloppy and confuses readers in other countries.
Tips for clearer charts
- Keep labels short. Three or four words per box reads better than a sentence.
- Cut the Gantt chart to the level people need. A client wants phases. Your team wants tasks. Make two charts rather than one huge one.
- Put the date in the file name when you share a schedule, so nobody works from an old version.
- Need a schedule people can update in a spreadsheet? Our Excel templates include a Gantt sheet with formulas.
Charts usually end up in a deck or a plan. The presentation templates and business plan template pair well with this tool.
Questions people ask
Is this Gantt chart maker free?
Yes. Every chart type and both download formats are free, with no signup and no watermark.
Can I make a timeline template for school?
Yes. Choose timeline mode, type one date and event per line, and download a PNG for your slides or report. It works for history projects, biographies and book timelines.
How is a Gantt chart different from a timeline?
A timeline shows when events happen. A Gantt chart shows how long each task lasts and where tasks overlap, which makes it better for managing a project.
Can I make a flowchart with decisions?
Yes. Write each step on its own line and connect them with arrows; the sample in flowchart mode shows how to write a yes and no branch.
Can I edit the chart in Google Slides or PowerPoint?
The PNG works as an image in either. If you want to edit shapes and text, download SVG and open it in a vector editor, or insert it into PowerPoint, which can convert SVG to editable shapes.
Is my data stored anywhere?
No. The chart is drawn in your browser and nothing is sent to a server.